Home > About WTC

Technical Visits

Shenzhen-Zhongshan Link

Integrating "bridge, artificial island, tunnel and underground interchange", the 24.03km Shenzhen-Zhongshan Link is a cutting-edge cross-sea channel project adopting the scheme of Tunnel on the east part and Bridge on the west part. The new structure of "steel shell+concrete" is used for the immersed tube, which has a large load-bearing capacity, good waterproof perfor-mance and significant social, economic and ecological value.

Project Features

Overcoming challenges such as aviation height restrictions, wind-wave interactions, and complex geological conditions.

The main span 1666 meters of three-span full floating system suspension bridge with 92 meters high.

The East Artificial Island of this project is the world's first underwater interchange for highways.

The first one in the world where steel shell concrete tubes are applied in large scale for the construction of eight-lane (in dual directions) immersed tube tunnel.

Note :
1. The minimum number of visitors for each project visit is 10 people.
2. Please complete the payment within 3 days after booking, otherwise your order will be cancelled. If you still want to participate in this project, you need to rebook.

If the number of visitors for the route and the batch does not reach the minimum requirement, PCO will adjust the visit batch or route according to the situation. PCO reserves the rights to the final interpretation. Thank you for your understanding.

The batch information is as follows:

The First Batch:

Time: On the morning of 25 April 2024

Maximum Number of Visitors: 40 visitors

Price: 120 RMB per person

The Second Batch:

Time: On the morning of 25 April 2024

Maximum Number of Visitors: 40 visitors

Price: 120 RMB per person

The Third Batch:

Time: On the afternoon of 25 April 2024

Maximum Number of Visitors: 40 visitors

Price: 120 RMB per person

Note: The two batches on April 25th are the same tour route with the visiting time differing by around 1 hour.

Participate in project 1, click here

Pick-up Point:

Gate 10, Hall 20, Shenzhen World Exhibition & Convention Center

Departure Time:

First Batch(April 25): 08:30

Second Batch(April 25):09:00

Third Batch(April 25): 13:00

Project Address:

(No.1001, Airport Ferry Terminal , Bao'an District, Shenzhen, Guangdong.)

Distance from:

Shenzhen WECC:about 16 km, 50mins' drive.

Shenzhen Bao'an International Airport: about 5 km, 10mins' drive.

Guangzhou Baiyun International Airport:about 134 km, 105mins' drive.

Hongkong International Airport:about 55 km, 75mins' drive.

Attentions:

1.Please arrive at the pickup point and get on your bus according to the destination sign. The buses will leave ON TIME and won't wait. Thank you for being there 5-10 minutes in advance to secure the smooth operation of the visit.

2.If you have checked out of the hotel, your luggage can be stored at the hotel or taken on the bus, please ensure that your luggage is marked properly. After the visit ends, the bus will return to Shenzhen World Exhibition & Convention Center. Please remember to take all your personal items and luggage with you. Do not leave anything behind.

3.The following is the specific itinerary for the visit, and it is for reference only. The actual timings shall prevail.

4.Only helmets are provided when visiting. For your safety, we suggest that you wear your own safty shoes.

Shenzhen-Zhongshan Link
First Batch April 25 AM Second Batch April 25 AM Third Batch April 25 PM Itinerary Remarks
8:30-9:20 (50 mins) 09:00-09:50 (50 mins) 13:00-13:50(50 mins) Shenzhen WECC → East Artificial Island Bus reserved by WTC2024
9:20 9:50 13:50 Arrive East Artificial Island
09:20-09:40 (20 mins) 09:50-10:10 (20 mins) 13:50-14:10 (20 mins) Visit East Artificial Island underwater interchange, cofferdam
09:40-09:50 (10 mins) 10:10-10:20 (10 mins) 14:10-14:20 (10 mins) To Immersed Tube Tunnel
09:50-10:10 (20 mins) 10:20-10:40 (20 mins) 14:20-14:40 (20 mins) Visit Immersed Tube Tunnel E1 Tube/the exit of West Artificial Island (It depends on the construction conditions)
10:10-10:20 (10 mins) 10:40-10:50 (10 mins) 14:40-14:50 (10 mins) To West Artificial Island
10:20-10:40 (20 mins) 10:50-11:10(20 mins) 14:50-15:10(20 mins) Visit West Artificial Island L3 platform on the building
10:40-10:50 (10 mins) 11:10-11:20 (10 mins) 15:10-15:20 (10 mins) To Lingdingyang Bridge
10:50-11:10 (20 mins) 11:20-11:40 (20 mins) 15:20-15:40 (20 mins) Visit Lingdingyang Bridge The Largest Offshore Suspension Bridge
11:10-12:00 (50 mins) 11:40-12:30 (50 mins) 15:40-16:30 (50 mins) Lingdingyang Bridge → Shenzhen WECC
End of the visit
Bus reserved by WTC2024
The visiting time is for reference only, the actual visiting time shall prevail. PCO reserves the right to adjust the visiting time.