Home > About WTC
Technical Visits
Shenzhen-Zhongshan Link
Integrating "bridge, artificial island, tunnel and underground interchange", the 24.03km Shenzhen-Zhongshan Link is a cutting-edge cross-sea channel project adopting the scheme of Tunnel on the east part and Bridge on the west part. The new structure of "steel shell+concrete" is used for the immersed tube, which has a large load-bearing capacity, good waterproof perfor-mance and significant social, economic and ecological value.
Overcoming challenges such as aviation height restrictions, wind-wave interactions, and complex geological conditions.
The main span 1666 meters of three-span full floating system suspension bridge with 92 meters high.
The East Artificial Island of this project is the world's first underwater interchange for highways.
The first one in the world where steel shell concrete tubes are applied in large scale for the construction of eight-lane (in dual directions) immersed tube tunnel.
Note: The minimum number of visitors for each project visit is 10 people.
If the number of visitors for the route and the batch does not reach the minimum requirement, PCO will adjust the visit batch or route according to the situation. PCO reserves the rights to the final interpretation. Thank you for your understanding.
The batch information is as follows:
The First Batch:
Time: On the morning of 25 April 2024
Maximum Number of Visitors: 40 visitors
Price: 120 RMB per person
The Second Batch:
Time: On the morning of 25 April 2024
Maximum Number of Visitors: 40 visitors
Price: 120 RMB per person
Note: The above two batches are for the same project, with the visiting route and content being identical. The only difference is that the visiting time for each batch is staggered by 30 minutes.
Participate in project 1, click here