Home > About WTC

Technical Visits

Shenzhen Qianhai Integrated Transport Hub

Qianhai Integrated Transport Hub is one of the very rare large transport hub TOD projects totally located under-ground in China. The transport hub involves three metro lines (Line No.1, 5 and 11), and two intercity railways (the Guangzhou-Dongguan- Shenzhen Intercity Railway and the Hong Kong-Shenzhen Western Railway).

Project Features

Be "seamlessly connected" with the high-end urban complex through three-dimensional public transporta-tion to achieve a high degree of composite and intensive use of land.

The underground space of the project is a deep foundation pit project near the sea, in which the hub interchange hall and underground space for property development is a 6-storey basement with a total length of 830m.

BIM+CIM technology is applied to the whole process of design, construction and operation management.

A strong cultural and art consulting unit Tsinghua Art Institute (QINGSHANG DISPALY) is introduced to carry out the project's cultural and art planning, spatial planning and subsequent implementation of cultural and art design consulting to enhance the project's cultural connotation, commercial value, urban vitality and sustainable development momentum.

Note: The minimum number of visitors for each project visit is 10 people.

If the number of visitors for the route and the batch does not reach the minimum requirement, PCO will adjust the visit batch or route according to the situation. PCO reserves the rights to the final interpretation. Thank you for your understanding.

The batch information is as follows:

The First Batch:

Time: On the morning of 25 April 2024

Maximum Number of Visitors: 50 visitors

Price: 120 RMB per person

The Second Batch:

Time: On the morning of 25 April 2024

Maximum Number of Visitors: 50 visitors

Price: 120 RMB per person

Note: The above two batches are for the same project, with the visiting route and content being identical. The only difference is that the visiting time for each batch is staggered by 60 minutes.

Participate inproject 5, click here